List of Materials
List of Equipment
  • Low Level Scaffolding (To construct floor & walls)

  • Hoist/Pulleys (To raise structural beams into place)

  • Plastic Sheets/Tarps (To protect existing building and section off construction area)

List of Materials:

  •  

  • 12”x12”x14’ Douglas Fir Beams

  • 2”x10”x14’ Douglas Fir Floor Joists

  • ¾” Tongue & Groove Plywood Subfloor

  • ½” Engineered Hardwood Flooring

  • 2”x4”x8’ Studs

  • ⅝” Drywall Gypsum Panels (Increased fire and sound protection)

  • Fiberglass Wall Insulation (Increased soundproofing)

  • 36” Interior Doors

  • 2’x4’ Exterior Vinyl Windows (Match existing below)

  • Wood Frame Glass Enclosure (Between top of 8’ walls and vaulted ceiling)

  • Moveable Paired Panel Partition Walls http://www.modernfold.com/operable_partitions_paired_panel.aspx

  • Gas Fireplace

  • Light Fixtures & Switches (Top and bottom floors)

  • Electrical, Internet, Phone Receptacles

  • Project Manager/Coordinator

  • Structural Consultant

  • General Contractor

  • Sub-Contractors (Electricians, Drywallers, Flooring/Window/Fireplace Installation)

List of Personnel

Materials & Resources

 

In order to complete the proposed second floor extension, specific materials, equipment, and personnel will be required. The following three lists describe the materials, equipment, and personnel which are required for the construction of the proposed design.